Fast Track Implementation Plan Details

Fast Track Implementation Plan Details (taken from CMWU’s report):

  • Waste Water Activities Activity Status

12" sewage carrier in Salah Khalaf Street in Gaza — finished
14" sewage carrier between PS9 and PS7B in Gaza — finished
Repair of the generator and electrical panel of PS Mashroaa' in Beit Lahia — finished
PS4 electrical repair in Beit Lahia — finished
16" sewage carrier from Beit Hanoun main PS to BLWWTP — on-going
24" sewage carrier between PS7B and GWWTP — on-going
Embankment of the anaerobic lagoon no 3 in GWWTP — on-going

  • Water Activities Activity Status

12" carrier pipe line from Safa wells group to Gaza city —  finished
Re-operate Naaja wells — finished
fix Shiekh Ejleen2 electrical connection — finished
Installation of electrical motor in Zohor Well in Jabalia — finished
10" carrier pipe line from Mograga wells group to Nusseirat — finished
Carrier pipe lines repairs in Fukhari and Naser Villages — finished

Back to “Implementation”